A fire wall built in blockwork or plasterboard has to meet the concrete slab above it. The join is called the wall head. Along it there is usually a gap.

Sometimes the gap is a few millimetres. Sometimes it is 30mm or more, because the slab above is allowed to move or sag a little. Above a suspended ceiling, nobody sees it.

A 20mm gap along a 10 metre corridor wall is a big hole in total. Fire stopping has to close it.

A black corrugated conduit passing into a blockwork wall with patchy old mastic around it
A black corrugated conduit passing into a blockwork wall with patchy old mastic around it

Two kinds of wall head

Fixed. The wall is built tight to the slab and the slab is not expected to move much. The gap gets packed and sealed.

Movement. In some buildings, mostly framed ones with long spans, the slab can drop a little under load. The seal at the wall head has to let it move and still hold fire. There are tested products for that, such as fire-rated foam strips and sealants with a stated movement range.

The drawings or the structural engineer say which kind you have. If nobody knows, we say so in the report.

Other linear gaps

Where a block wall meets a column or a concrete wall. Where a new partition meets an old wall. Where a plasterboard wall meets the window frame on an outside wall.

How it is done

Gap measured along its length, because it is rarely even. Mineral wool packed in where the detail calls for it. Sealant or a linear seal fitted to the tested depth. Photos every few metres. One record line per length of wall, with start and end points.

Example line, made up:

Item 31. First floor, corridor wall to stair, wall head from gridline B to D. Gap 10 to 25mm. Wool backing, fire sealant both faces. 60 minutes. Photos 31a to 31d.

Who does it

Our BM TRADA / FIRAS-certificated contractors. Wall heads usually come with ceiling tiles up, so we plan corridor by corridor.

Need a price for fire stopping in Leeds?

Tell us the postcode, what the building is used for and how many floors it has. Photos of the gaps help a lot.

Call 0113 519 4247Get a quote